500,000 Days of Component Life. Recovered in Weeks.

Aviation Technical Services IFS Maintenix Optimization U.S. regional airline operator
  • {{ s.stat }}

    {{ s.label }}

The Situation

A U.S. regional airline operator flies 143 regional jets. When the airline announced a headquarters relocation, experienced staff in maintenance planning, records, and ERP administration chose not to move with it.

They didn't just lose headcount. They lost the people who understood their Maintenix configuration at the table level, who knew which component intervals were set correctly and which weren't, and who could pull maintenance program data without a three-month learning curve.

Simultaneous turnover at the director level made it worse. The airline needed to keep 143 aircraft flying while executing improvement projects it could no longer staff internally.

They needed expertise immediately. Most consulting firms would need months before contributing anything useful.

The Approach

Tsunami already employed maintenance planners and Maintenix specialists who had worked inside that operation. People who had done these exact jobs at the airline before joining Tsunami.

Within one week of contract signing, a former maintenance planner and a Maintenix ERP specialist were onboarded and working. No orientation. No shadowing period. They already knew the aircraft, the operation, and the system.

From there, Tsunami deployed a combined team of maintenance planners, ERP specialists, and developers across six projects simultaneously:

  1. {{ p.n }}

    {{ p.title }}

    {{ p.body }}

    {{ p.note }}

What connected all six projects: people who understood both the maintenance operation and the ERP system that runs it.

The Results

{{ r.lead }}
{{ r.body }}

The Relationship

Tsunami continues to support the airline through its transition, providing maintenance planning resources and ERP expertise as new hires come on board. This isn't a project. It's a partnership.

Need Maintenix Expertise Without the Ramp-Up?

Speak to an Expert

500,000 Days of Component Life. Recovered in Weeks.

Aviation Technical Services IFS Maintenix Optimization U.S. regional airline operator
  • 143

    Aircraft

  • 500K

    Days Yield Recovered

  • 2,868

    Hours Eliminated/Year

  • 1 Week

    to Deploy

  • 6

    Concurrent Projects

The Situation

A U.S. regional airline operator flies 143 regional jets. When the airline announced a headquarters relocation, experienced staff in maintenance planning, records, and ERP administration chose not to move with it.

They didn't just lose headcount. They lost the people who understood their Maintenix configuration at the table level, who knew which component intervals were set correctly and which weren't, and who could pull maintenance program data without a three-month learning curve.

Simultaneous turnover at the director level made it worse. The airline needed to keep 143 aircraft flying while executing improvement projects it could no longer staff internally.

They needed expertise immediately. Most consulting firms would need months before contributing anything useful.

The Approach

Tsunami already employed maintenance planners and Maintenix specialists who had worked inside that operation. People who had done these exact jobs at the airline before joining Tsunami.

Within one week of contract signing, a former maintenance planner and a Maintenix ERP specialist were onboarded and working. No orientation. No shadowing period. They already knew the aircraft, the operation, and the system.

From there, Tsunami deployed a combined team of maintenance planners, ERP specialists, and developers across six projects simultaneously:

  1. 01

    Maintenance planning support and training

    Day-to-day planning for flight line and heavy maintenance visit work packages. Improved throughput, and trained new hires coming on board during the transition.

  2. 02

    Component interval verification (103 components)

    Pulled Maintenix tables to verify restoration and overhaul intervals against the maintenance program. Validated tracking hours, cycles, and last overhaul dates. Found incorrect settings that were driving unnecessary overhauls and creating overfly risk.

  3. 03

    Duplicate task analysis

    Extracted maintenance program data, technical orders, and AD information from Maintenix. Built a comprehensive comparison across the full data set to identify where duplicate tasks were consuming unnecessary labor.

  4. 04

    Task card material updates

    Added parts to specific task cards within the system. Completed under time, under budget.

  5. 05

    Special tool cart configuration

    Created station-specific tool carts for calibrated and special tools used in intermediate maintenance on overnight visits. Required understanding how tools are managed, assigned, and promoted within Maintenix without creating duplicate instances.

  6. 06

    Zonal A&B check repackaging

    Converted standard block check task collections into zonal format. Combined programming expertise (parsing OEM HTML maintenance manual data), ERP load sheet expertise, and airline maintenance task card knowledge.

    Project on track, placed on hold by the client due to operational priorities.

What connected all six projects: people who understood both the maintenance operation and the ERP system that runs it.

The Results

500,000 days of component utilization yield recovered.
Analysis of 103 components revealed incorrect restoration and overhaul intervals in the Maintenix configuration. Correcting those settings recovered 500,000 days of component life, cutting unnecessary overhaul costs and eliminating overfly risk. The airline expanded the original scope after seeing initial findings.
2,868 man-hours per year eliminated.
40 duplicate maintenance tasks identified by pulling data directly from Maintenix tables. Their frequency across the 143-aircraft fleet meant 2,868 hours of unnecessary labor annually, plus vendor costs for outsourced duplicate work. All eliminated.
Across all projects: delivered on time, under budget.

The Relationship

Tsunami continues to support the airline through its transition, providing maintenance planning resources and ERP expertise as new hires come on board. This isn't a project. It's a partnership.

Need Maintenix Expertise Without the Ramp-Up?